Middlebury Union Middle School (MUMS) Re-Roof Project Middlebury, VT

This project consisted of a 53,000 sqft roof replacement.  The old asphalt shingle system was removed and replaced with a new standing seam metal roof system. Rigid insulation was also added to the entire gymnasium roof, which included the removal and replacement of the existing roof sheathing. New metal fascia was installed around the entire perimeter. This project was completed within the required 3 month time schedule.

Addison County School District

Truexcullins, Architect

Completed: August 2012