Projects: Pre-engineered Metal Buildings

Photo of Applejack Art Partners

Applejack Art Partners

This project included assistance in the acquisition of land, design of the building and site, the procurement of local and state permits and the complete general contracting and construction of 32,000 sf office building and distribution facility.  A Steelox pre-engineered steel structure was utilized for the entire facility. This is the perfect example of a […]

Photo of Stratton Town Garage

Stratton Town Garage

This project consisted of construction of a new 8,400 sqft pre-engineered metal building for the town highway department.  Complete with a mezzanine for office space and file storage. The building also included radiant heat in the slab, spray foam insulation on the walls and 12″ of fiberglass insulation in the roof. This building was an […]

Photo of VELCO MSF Addition

VELCO MSF Addition

The 1400 sqft addition was added in the winter of 2008 and houses an additional service bay and locker rooms.

Photo of Long Trail Brewery Building

Long Trail Brewery Building

This project included major assistance in the design of the building and site, assistance in procurement of local and State permits and the complete construction management and building construction of a 16,000 sq. ft. manufacturing and distribution facility located adjacent to U. S. Route 4 in Bridgewater Corners, Vermont.  A Steelox pre-engineered steel structure was […]

Photo of AOT Snow Removal Equipment Building

AOT Snow Removal Equipment Building

This 40 x100 pre-engineered metal building was constructed for the State of Vermont Agency of Transportion. The 4,000 sf facility houses snow removal equipment used for the Rutland State Airport.

Photo of Hand Motors

Hand Motors

The Hand Chevrolet Service Center is located on Route7A in Manchester Center, Vermont. This 22,000 sf, single slope, pre-engineered structure was developed as a design-build project with VMS Construction as the general contractor and BMA Architects. The building contains fifteen service bays, a substantial parts storage area, customer reception area and lounge, employee lounge and […]

Photo of Applied Bolting

Applied Bolting

New construction of a 2,400 sf pre-engineered addition to an existing building. Project included all interior framing, finishing, etc. Installation of new windows, door, heating system and landscaping. 2nd Place Winner in the 2011 American Buildings Excellence in Design Competition

Photo of de Rham Industrial Building

de Rham Industrial Building

This newly constructed building contains 7,500 sf of space.  There is a two story 3,000 sf office with the remainder of the building being utilized for storage. A loading dock is located on the side of the facility. All sitework and landscaping was done by VMS.

Photo of GSK Tennis Building Addition

GSK Tennis Building Addition

VMS prepared the site for the construction of this 25’ x 150’ pre-engineered metal addition to an existing metal building. The job involves the demolition of concrete walls for pass through between the buildings, relocation of existing windows, installation of an overhead door, a roof insulation system and construction of interior partitions. A driveway/loading dock […]

Photo of Vermont Electric Power Corporation (VELCO)

Vermont Electric Power Corporation (VELCO)

The original 6,000 sf structure was erected in 2001 and houses service bays and office space. All sitework, paving and landscaping was done by VMS. The 1,400 sf addition was added in the winter of 2008 and houses an additional service bay and locker rooms. The locker rooms were completed by the Owner.