Projects: Commercial

Photo of ACTR – Addison County Transit Resource Center

ACTR – Addison County Transit Resource Center

This project included the construction of a new ±14,000 square foot bus services building, comprising of a 2-story office building attached to a 6-bay maintenance and bus wash facility. Some features of this energy efficient facility include a TPO roof (designed to catch rain water for use in the bus wash), insulated metal wall panels, […]

Photo of VELCO Warehouse Conversion

VELCO Warehouse Conversion

This project consisted of combining a 6,000 s.f., existing single story, slab on grade, steel framed warehouse with an adjacent 2,200 s.f. office wing. This complete renovation of both spaces was transformed into a state of the art open office concept, including meeting rooms, storage rooms, bathrooms, library, café and lounge.  This project also included […]

Photo of Tenneybrook Convenient Store

Tenneybrook Convenient Store

Renovations to existing gas station into convenience store including, but not limited to, new structional modifications, exterior thermal envelope, new siding, and windows, skylights & EPDM roof, tile floor, and maple case work with granite.

Photo of Casella Customer Center

Casella Customer Center

The project consisted of converting the remaining half of the pre-engineered metal building, that was the former home to the Eagles Club, into a 2-story office space. The work took place while the the other half of the building was occupied by Casella’s call center. Exposed HVAC ducts were worked into the open office concept […]

Photo of Applejack Art Partners

Applejack Art Partners

This project included assistance in the acquisition of land, design of the building and site, the procurement of local and state permits and the complete general contracting and construction of 32,000 sf office building and distribution facility.  A Steelox pre-engineered steel structure was utilized for the entire facility. This is the perfect example of a […]

Photo of Holiday Inn

Holiday Inn

Inside and out, the Holiday Inn in Rutland now sports a refurbished contemporary look. Exterior work included updating the building’s façade, sprucing up the entrance and adding ambient lighting. Interior renovations provide a warm welcome with the installation of new flooring, wall coverings and recessed lighting.

Photo of Stratton Town Garage

Stratton Town Garage

This project consisted of construction of a new 8,400 sqft pre-engineered metal building for the town highway department.  Complete with a mezzanine for office space and file storage. The building also included radiant heat in the slab, spray foam insulation on the walls and 12″ of fiberglass insulation in the roof. This building was an […]

Photo of Kinney Motors

Kinney Motors

Extensive renovations to an existing automotive dealership. Work included the revamping of two showroom floors. Updates where made from floor to ceiling. Imported Italian tile was installed as well as new overhead lighting. Exterior renovations incorporated a new entry and signage.

Photo of Grove St. Jolley Convenience Store

Grove St. Jolley Convenience Store

This project consisted of complete demolition of an existing convenience store and construction of a new one story convenience store located in Rutland, VT.

Photo of Northshire Book Store

Northshire Book Store

Renovation to existing three story bookstore, as well as construction of a 11,500 sf wood frame addition with extensive sitework.

Photo of Aubuchon Hardware

Aubuchon Hardware

Formerly the Dexter Shoe Outlet, this building was completely renovated to accommodate the new Aubuchon Hardware retail store. This project included a new rear building and side shed addition.

Photo of Long Trail Brewery Building

Long Trail Brewery Building

This project included major assistance in the design of the building and site, assistance in procurement of local and State permits and the complete construction management and building construction of a 16,000 sq. ft. manufacturing and distribution facility located adjacent to U. S. Route 4 in Bridgewater Corners, Vermont.  A Steelox pre-engineered steel structure was […]

Photo of AOT Snow Removal Equipment Building

AOT Snow Removal Equipment Building

This 40 x100 pre-engineered metal building was constructed for the State of Vermont Agency of Transportion. The 4,000 sf facility houses snow removal equipment used for the Rutland State Airport.

Photo of Hand Motors

Hand Motors

The Hand Chevrolet Service Center is located on Route7A in Manchester Center, Vermont. This 22,000 sf, single slope, pre-engineered structure was developed as a design-build project with VMS Construction as the general contractor and BMA Architects. The building contains fifteen service bays, a substantial parts storage area, customer reception area and lounge, employee lounge and […]

Photo of Applied Bolting

Applied Bolting

New construction of a 2,400 sf pre-engineered addition to an existing building. Project included all interior framing, finishing, etc. Installation of new windows, door, heating system and landscaping. 2nd Place Winner in the 2011 American Buildings Excellence in Design Competition

Photo of Bennington Rescue Squad

Bennington Rescue Squad

Renovations and additions to the Bennington Rescue Squad included a new front entry, re-roofing, expansion of existing parking, a new 3,100 sqft drive through three bay garage, a new 360 sqft wellness center, and extensive interior renovations of the existing facility. The interior renovations included new bathrooms, a new kitchen, a new conference room, and offices.

Photo of Cavendish Pointe Hotel – 22,000 sqft Suites Addition

Cavendish Pointe Hotel – 22,000 sqft Suites Addition

The construction of 26 one bedroom suites in a 22,000 sf, two story, wood frame addition to the Clarion Hotel in Cavendish, VT. This project was completed in 5 months.

Photo of 210 South Street

210 South Street

The 210 South Street Project consisted of the renovations of an existing mid-1900 manufacturing building.  The work included extensive demolition and structural renovations, new roofing, new windows, extensive masonry restoration, framing, finishes and full sprinkler mechanical and electrical systems. The building currently houses BMA Architects, Adecco and various other businesses.

Photo of Vermont Electrical Power Corporation (VELCO) 12,000 sqft Warehouse

Vermont Electrical Power Corporation (VELCO) 12,000 sqft Warehouse

Construction of a new 12,000 sq.ft. warehouse facility to accommodate storage of essential equipment for the power company’s transmission lines and substations.

Photo of de Rham Industrial Building

de Rham Industrial Building

This newly constructed building contains 7,500 sf of space.  There is a two story 3,000 sf office with the remainder of the building being utilized for storage. A loading dock is located on the side of the facility. All sitework and landscaping was done by VMS.

Photo of Berkshire Bank

Berkshire Bank

Construction of a new two story, 6,500 sqft wood framed branch bank with a drive-thru teller.  This project included custom interior casework at the teller stations and check writing counters, molded ceiling trims, molded door and window casings, molded chair rail trims, wainscoting, and custom interior column trims.

Photo of Drysdale Building

Drysdale Building

The renovation and addition to an historical 3-story, 18,000 sf building in downtown Bennington, VT. The project included complete renovation of the 2nd floor to office space and the 3rd floor to four high-end condominium units. The 1st floor was home to an existing retail operation which remained open during the entire project. The addition […]

Photo of Proctor Phosphorus Removal Improvements

Proctor Phosphorus Removal Improvements

The construction of a new phosphorus removal building to accommodate the existing waste treatment plant. This renovation to existing system and new system addition included sitework erosion control, site piping, grading, manhole installations, paving and installation of chemical feed tanks, pumps and mixing equipment. VMS had to work quickly and efficiently to achieve the draining […]

Photo of Middlebury Wastewater System Improvements

Middlebury Wastewater System Improvements

Work included the building of a new 5,000 sqft emergency storm water storage tank (wet well). Sluice gates and piping were installed to connect the new wet well to an existing facility. VMS also built a new grit removal building including the installation of the grit removal equipment and associated piping. Modifications to existing equipment […]

Photo of Springfield Water System Improvements

Springfield Water System Improvements

Spread out over a mile of land, the Springfield Water System Improvement Project consisted of the renovation to the existing five well  houses and updating old pumps and well points. Also included was the installation of new turbine and suction sub pumps providing the Town of Springfield with a state-of-the-art, efficient domestic water delivery system.

Photo of GSK Tennis Building Addition

GSK Tennis Building Addition

VMS prepared the site for the construction of this 25’ x 150’ pre-engineered metal addition to an existing metal building. The job involves the demolition of concrete walls for pass through between the buildings, relocation of existing windows, installation of an overhead door, a roof insulation system and construction of interior partitions. A driveway/loading dock […]

Photo of Kenneth Cole

Kenneth Cole

Fit up of a 2,400 sf retail space. Renovations included a new entry, signage and landscaping.

Photo of Bank of Bennington

Bank of Bennington

The construction of a two-story, wood frame shell, including all exterior finishes. No interior finish, mechanical or electrical was included in the contract.

Photo of Vermont Electric Power Corporation (VELCO)

Vermont Electric Power Corporation (VELCO)

The original 6,000 sf structure was erected in 2001 and houses service bays and office space. All sitework, paving and landscaping was done by VMS. The 1,400 sf addition was added in the winter of 2008 and houses an additional service bay and locker rooms. The locker rooms were completed by the Owner.